The challenge of the Yarra Crossing was to build a road tunnel
under the Yarra River in a busy area of inner Melbourne Australia.
\
The vertical and horizontal alignment constraints meant that
the tunnel needed to be relatively shallow and only just under the
river bed in soft alluvial sediments. The 1200 mm diameter secant
piles were installed to form the permanent walls for the majority
of the river crossing...